Premier SIPs have standard horizontal chases pre-cut at 16 and 45 inches off the floor. There is also a vertical chase spaced every four feet. For quick chase access, simply drill access holes through the top and bottom plates so your electrician will not have to drill into studs (like other dimensional lumber framing techniques).
Technical Bulletin #8 Wiring Premier SIPs
Technical Bulletin #17 Recessed lights in Premier SIPs
View All Premier SIPs Technical Bulletins
View All Electrical Details - See PBS Detail #206 and #207
We are happy to help offer resources and literature so that your electricians feel comfortable installing wiring in SIPs panels. Electricians we work with regularly recommend SIPs over other lumber framing techniques.
If you're an electrician interested in receiving SIPs electrical training. Contact the Sales Representative in your area.
Premier meets the needs of design professionals time and time again, for over 20 years.
Technical Info: Load Charts, Technical Bulletins, Code Reports
When you sell Premier SIPs you are part of the group of innovators who are quickly gaining market share, profitability, and position in the SIP market.
Use Premier SIPs to quickly build quality green structures at competitive prices.
Why settle for framing products that aren't as strong, straight or green as Premier SIPs?
Zero Energy SIP Built School, Students Compete to Learn Energy & Water Conservation...
View Project | Project Gallery

Privacy Policy Terms & Conditions Client Log-In © 2011 Premier Building Systems
Premier Building Systems 6004 N. Westgate Blvd Suite 230 Tacoma, Washington 98406
Contact Premier |
Toll free: 800.275.7086 |
Email
Follow Us On Twitter
Become a Fan on Facebook
View our Projects on Flickr